Question
A can complete a piece of work in 12 days and B can complete the same work in 18 days. If they work together, in how many days will they finish the entire work?
Step-by-Step Solution:
कार्य और समय (Time & Work) के प्रश्न कैसे हल करें: LCM विधि, सूत्र और ट्रिक्स
Time and Work (कार्य और समय) is one of the highest-weightage arithmetic topics in MP Police Constable, MP Sub-Inspector, MP Patwari, SSC, and Railway exams. The fundamental principle is an inverse relationship: if a person works faster (higher efficiency / कार्य क्षमता), they take fewer days to complete the job. Instead of tedious fraction addition, top scorers use the LCM Method, assuming the total work is the LCM of the days given, turning fraction problems into rapid whole-number addition.
Understand these foundational properties before solving questions
Total work done is the product of a person's rate of work per day (efficiency) and the total number of days worked. Efficiency measures the units of work done per unit time.
When person A completes a work alone in A days and person B completes it in B days, their combined completion time is the product of their days divided by the sum of their days.
Assume the total work is equal to the LCM of the individual completion days. Dividing the total units by each person's days directly yields their daily output in integer units.
The ratio of time taken by two workers is the exact inverse of their daily efficiency ratio.
Relates Men (M), Days (D), Hours per day (H), and Work completed or wages earned (W) across two different working scenarios.
Compensation is distributed strictly in proportion to the actual units of work contributed by each individual worker.
Follow these universal steps in order to solve any Quantitative Aptitude question accurately:
Identify the individual completion times given in the problem and calculate their Least Common Multiple (LCM). Treat this LCM value as the total work measured in 'units'.
Divide the total units of work by each worker's individual time in days. This gives each worker's daily production rate (units/day).
For collaborative work, add the efficiencies together (A + B = 3 + 2 = 5 units/day). For alternate days, calculate work completed in a 2-day cycle. For leaving or joining problems, break the schedule into distinct time segments.
Multiply the daily efficiency by days worked in each phase. Subtract completed units from total units to determine the Remaining Work.
Divide the relevant units of work by the active efficiency to find the required days. Double-check whether the question asks for 'remaining days' or 'total days taken to complete the entire work'.
Real questions solved step-by-step showing every calculation
Question
A can complete a piece of work in 12 days and B can complete the same work in 18 days. If they work together, in how many days will they finish the entire work?
Step-by-Step Solution:
Question
A can complete a task in 15 days, and B can complete it in 20 days. They worked together for 4 days, after which A left the work. How many more days will B take to complete the remaining work alone?
Step-by-Step Solution:
Question
A and B can complete a work individually in 20 days and 30 days respectively. If they work on alternate days starting with A on the first day, in how many days will the entire work be completed?
Step-by-Step Solution:
Question
12 men can complete a project in 18 days working 8 hours a day. In how many days can 16 men complete twice the amount of work if they work 9 hours a day?
Step-by-Step Solution:
Avoid these frequent traps to protect yourself from negative marking
Test your understanding on your own first, then reveal the step-by-step solution to check your work:
A, B, and C can complete a piece of work individually in 12, 15, and 20 days respectively. If all three work together, in how many days will the work be completed?
A is 50% more efficient than B. If B alone can complete a piece of work in 30 days, in how many days can A and B working together complete the same work?
A and B undertook to do a piece of work for ₹1,200. A alone can do it in 8 days while B alone can do it in 12 days. With the assistance of C, they finish the work in 4 days. What is C's share of the wages?
Practice exam-level multiple choice questions on MPExamly with full timer simulations, detailed answer explanations, and instant score reports. 100% free with no login required!
Continue learning with these step-by-step problem-solving tutorials
The Least Common Multiple (LCM), or लघुत्तम समापवर्त्य (ल.स.), of three numbers is the smallest positive number that is completely divisible by all three numbers without leaving any remainder. In competitive exams like MP Police Constable, MP Patwari, and SSC, LCM questions frequently appear in arithmetic, time and work, and bell-ringing interval problems.
One of the most frequently asked question patterns in state competitive exams is based on the golden mathematical relation between the LCM and HCF of two numbers. Knowing how to manipulate this formula saves valuable minutes during exams.
Profit and Loss (लाभ और हानि) is one of the most fundamental and high-scoring arithmetic topics in MP Police Constable, MP Sub-Inspector, MP Patwari, MPPSC CSAT, and SSC exams. It covers transactions where commodities are acquired at a Cost Price (CP / क्रय मूल्य) and sold at a Selling Price (SP / विक्रय मूल्य). The foundational rule in competitive exams is that Profit Percentage and Loss Percentage are ALWAYS calculated relative to the Cost Price (CP), unless explicitly specified otherwise by the question.